GIRASSOL FPSO Project / TotalFinaElf, Angola. The Girassol FPSO (Floating Production Storage and Offloading Unit) contract for the topsides includes a DCS . While the history of floating production storage and offloading (FPSO) is paved with record cost overruns and delays, through the description of the Girassol. The Girassol FPSO hull is a double-hull design – with side ballast tanks over the full length of the cargo tanks, two fore and two aft peak ballast tanks, and single.

Author: Kajihn Yozshutaxe
Country: New Zealand
Language: English (Spanish)
Genre: Photos
Published (Last): 21 March 2018
Pages: 20
PDF File Size: 6.50 Mb
ePub File Size: 16.62 Mb
ISBN: 406-5-78708-619-5
Downloads: 52550
Price: Free* [*Free Regsitration Required]
Uploader: Vuran

Log in to your subscription Username. Peer reviewed only Published between: Advanced search Show search help.

Rock Mechanics Symposium and 5th U. Proceedings of an international conference Diverless and Deepwater Girasslo Proceedings of an international conference Oceanology: Proceedings of an International Conference Submersible Technology: Proceedings of an international conference Subsea Controls and Data Acquisition ‘ Offshore Technology Conference Disciplines 4.

Abstract While the history of floating production storage and offloading FPSO is paved with record cost overruns and delays, firassol the description of the Girassol FPSO project, this paper presents the ways and means used by the Operator- TotalFinaElf – to manage the successful development of the world’s largest deepwater FPSO installed in the Girassol field, offshore Angola. The Operator, in developing the FPSO, employed parallel engineering, functional specifications and an early involvement of the industry with an original contracting strategy in order to achieve the Girassol field gpso in less than six years from discovery to first oil setting a new standard for the Industry.

  AMERICA SEEN THROUGH PHOTOGRAPHS DARKLY SUSAN SONTAG PDF

The FPSO described here is now the only visible facility of this pioneering project for the offshore industry Figure A Introduction Discovered in Aprilthe Girassol field development was sanctioned two years later in July based on a subsea production scenario associated with a large FPSO, having the following main ffpso Sailaway of the FPSO from the construction yard in South Korea occurred at the end of March at a level of completion and commissioning never achieved before for fpwo production unit of such complexity.

The completion, just 33 months after the award of a contract based on functional specifications, constituted a new benchmark for future FPSO’s. The hull construction subcontract was performed in 19 months and the construction of the 25,tonnes topsides subcontract was done in 21 months.

The initial “fast-track” approach of the Girassol development required the FPSO execution to face the following challenges: Parallel reservoir engineering and surface facilities development; Interface data issues due to different schedule in design development between UFL and FPSO; Management of significant design data changes in throughput and treatment gigassol during contract execution; Additional challenges to the FPSO development came from the following adverse events which occured during the course of the project execution: Very buoyant shipyard market; Reallocation of topsides girasskl and integration site.

  ESTOMATITIS HERPETICA RECURRENTE PDF

From the first months after discovery, the Girassol FPSO development history described here presents how the Operatorand its Contractors, through the contracting strategy, the main architectural choices and project execution, faced these challenges and managed the successful FPSO development, crowned by first oil 41 months after project sanction.

Girassol: The FPSO Presentation and Challenges – OnePetro

About us Contact us Help Terms of use. Publishers Content Coverage Privacy.

Sheriff’s Encyclopedic Dictionary of Applied Geophysics, fourth edition.